Показать сообщение отдельно
Старый 24.09.2012, 13:07   #11  
Link is offline
Link
Британский учённый
Аватар для Link
Соотечественники
 
568 / 523 (19) +++++++
Регистрация: 25.11.2005
Адрес: UK
Записей в блоге: 9
Спасибо EVGL!

Вот нашел похожую тему, более понятным языком написано

И какой то мануал. Кто нибудь в курсе что за источник?



Цитата:
As standard the cost of sale transaction is not split one posted, it is booked out as a single cost from the inventory asset account finanically.

However if you setup your item cost groups and the costing sheet to mirror your breakdown you will see this in the ProdCalcTrans (?) table based upon the production order. Unfortunately you also need an item tracking dimension to be active to really track this, i.e. serial or batch numbering. You should also be aware if the production order is ended you can delete it and this deletes the cost breakdown in the tables.

Ultimately you can report on it, but the COGS will not post to the ledgers based upon this split, the item group of the parent posts to the COGS account solely based upon the inventory cost of the item.

Have a look at the Cost breakdown field in the inventory parameters, where you select No or Sub ledger. The selection of Sub ledger is termed an active cost breakdown. An active cost breakdown is critical for calculating, retaining and viewing cost group segmentation across a multilevel product structure for standard cost items. When the cost breakdown is active, you can report and analyze inventory, work in process (WIP), and cost of goods sold (COGS) per cost group in a single level, multilevel or total format. An active cost breakdown means that activating a manufactured item’s cost will result in storing the cost group segmentation within the item’s cost record.

The selection of none for the Cost breakdown field means that cost group segmentation will not be maintained for standard cost items. That is, a manufactured item's standard cost will be calculated and maintained as a single amount without cost group segmentation, and the cost contributions of manufactured components will be aggregated into the single amount.
__________________
Людям физического труда для восстановления своих сил нужен 7-8 часовой ночной сон. Людям умственного труда нужно спать часов 9-10. Ну а программистов будить нельзя вообще.

Последний раз редактировалось Link; 24.09.2012 в 14:32.